Plan review services in Florida come in two forms: the city or county building department, or a licensed private provider the property owner hires. Both check the same plans against the same Florida Building Code. What changes is who does the review, what lands on the building official’s desk, and how long the department gets to respond.
Many contractors default to the city queue because it is the path they know. The private provider route has been in Florida law for years, and the 2026 changes tightened the rules on how fast a building department must respond. For a crew waiting on a permit, the choice between the two paths often decides when work can start.
What Is Plan Review?
Plan review checks a project’s drawings and documents against the Florida Building Code before a permit is issued. Reviewers check structure, life safety, energy, and trade systems, so they catch code issues on paper instead of after the framing is up. Florida’s private provider law treats this work as a core building code review service, alongside field inspections.
Plan review sits at the front of the permit process:
- Plans are prepared and submitted with the permit application.
- A reviewer checks them against the code and flags anything missing or noncompliant.
- Corrections go back and forth until the plans pass.
- The permit is issued, and field inspections can begin.
Nothing on site moves until step four, which is why a slow review can hold up an entire schedule. Timelines, fees, and the full process are covered in the plan review guide for contractors.
Florida contractors have two ways to get that review done.
Plan Review Services Florida Contractors Can Choose From
Florida contractors have two paths: the local building department or a private provider hired by the property owner, or by the contractor with the owner’s written permission. Both review against the Florida Building Code. The difference is who reviews, what the city receives, and what the city can charge.
City Review vs. Private Provider Review
The two paths line up side by side like this:
| Local Building Department | Private Provider | |
|---|---|---|
| Who reviews | City or county plans examiners | A licensed building code administrator, professional engineer, or architect |
| Who hires them | No hire needed; review comes with the permit application | The property owner, or the contractor with written permission |
| Code used | Florida Building Code | Florida Building Code |
| What the city receives | The plans | The plans plus an affidavit, sworn under oath, that they comply with code |
| City’s role | Full plan review | A completeness check, plus local ordinances, floodplain rules, and site review |
| Permit fees | Standard fees | The city must reduce its fees for the review work the private provider performs. |
The city’s role narrows on private provider jobs. Once a private provider certifies the plans, the building official cannot redo that code review. The department can still check local requirements outside the building code, which is why the city can still send back some corrections. The same split between city and private work shows up in the field, covered in private inspectors vs. city inspectors.
The private provider path comes from one Florida law.
What Florida Statute 553.791 Says About Private Plan Review
Florida Statute 553.791 lets the property owner bring in a private provider at any time, for plan review alone, inspections alone, or the full scope. A contractor can make that choice with the owner’s written authorization. If a private provider handles plan review, the building official may also require one for the inspections, depending on the department’s policy.
The law sets a few ground rules on who can review and what they hand over:
- Licensed reviewers only. Architects, professional engineers, and building code administrators qualify, and each can review only within the disciplines covered by their license.
- No reviewing their own work. A private provider cannot provide these services on a building their own firm designed or built.
- An affidavit. The private provider certifies under oath that the plans comply with the code, and building departments must accept that affidavit electronically.
Response Deadlines on Private Provider Plans
Florida Statute 553.791 also puts the building department on the clock once the plans and affidavit arrive:
| Step | Deadline for the Building Department |
|---|---|
| Flag incomplete forms or documents | 10 business days after the application arrives |
| Flag incomplete forms, single-trade review on a one- or two-family home | 5 business days |
| Affidavit sealed by an engineer or architect | 10 business days to approve the permit or list specific deficiencies |
| Respond to corrected plans | The time left on the original clock plus 5 business days, limited to the issues it first raised |
| Miss a deadline | The permit is approved by law, with issuance due the next business day |
Corrections follow their own rules. The clock stops until the applicant fixes the flagged items, and a second notice can only cover issues the first notice raised, so a department cannot keep adding new comments. Permit fees also drop on private provider jobs, with firm minimums for commercial work, and those rules are laid out in private provider inspections.
The law covers homes and commercial buildings alike, but the review itself looks different for each.
Residential vs. Commercial Plan Review
Residential plan review covers homes, most often one- and two-family dwellings. Commercial plan review covers offices, retail, restaurants, and mixed-use buildings, and it usually involves more reviewers and a larger document set. Two Florida jurisdictions show the gap clearly.
In Hillsborough County, a new single-family home needs plans digitally signed and sealed by a Florida-registered architect or engineer, Florida energy efficiency forms R402 and R405, and Manual J load calculations from the mechanical contractor. In Miami Beach, a new commercial building goes through five separate department reviews, with signed and sealed drawings plus structural, drainage, and energy calculations.
Residential vs. Commercial Plan Review at a Glance
The two review types differ in scope, paperwork, and how the private provider rules apply:
| Residential Plan Review | Commercial Plan Review | |
|---|---|---|
| Typical projects | Single-family and two-family homes | Offices, retail, restaurants, multi-use buildings |
| Who reviews (examples) | Building plan review of the plans, energy forms, and load calculations (Hillsborough County) | Building, fire, planning, environmental, and public works review (Miami Beach) |
| Core documents | Signed and sealed plans, energy code forms, Manual J load calculations | Signed and sealed drawings, structural and drainage calculations, energy calculations, geotechnical report |
| City’s deadline to flag incomplete documents (private provider) | 5 business days for single-trade review; 10 business days otherwise | 10 business days |
| Private provider fee reduction | Fees reduced by the city’s cost savings | At least 25% off the plan review portion, or at least 50% off when the private provider handles all plan review and inspections |
Florida’s 2026 permitting law changed parts of this process for both.
What Florida’s 2026 Permitting Law Changed for Plan Review
HB 803 has governed Florida permit applications since July 1, 2026, and both plan review services Florida contractors use, city and private, now run under its rules. The changes that touch plan review:
- A 5-day response timeframe for permit applications on work valued under $15,000.
- Uniform residential and commercial building permit applications, now in development through a Florida Building Commission workgroup.
- Required commercial permit fee reductions on private provider jobs.
- A mandatory registration system for private providers and private provider firms in each local government.
The registration requirement comes with limits on the city. Under the statute, a building department cannot charge a fee to register or update a private provider’s registration, and it cannot demand a copy of the owner’s contract with the provider as part of the permit application. Contractors who want the full picture of the law can start with the Florida HB 803 overview.
With those rules in place, the private provider process follows a set order.
How Third-Party Plan Review and Approval Works, Step by Step
Third-party plan review and approval follows the same order on every job, from hiring the provider to picking up the permit:
- Hire the private provider. The property owner, or the contractor with the owner’s written authorization, hires a licensed private provider.
- Notify the building department. The department gets written notice that a private provider will handle plan review, along with the owner’s authorization, which can be a simple letter under BOAF’s HB 803 guidance.
- Review the plans. The private provider performs the building code review services, checks the drawings against the Florida Building Code, and works out corrections with the design team.
- Sign the affidavit. The provider signs the sworn statement of code compliance.
- Submit the package. The plans and affidavit go with the permit application, and the department must accept the affidavit electronically.
- Get the permit or a correction list. The department issues the permit or sends specific corrections within its legal deadline, and a missed deadline means the permit issues the next business day.
On this path, most of the review time sits with the private provider in step 3 instead of in the city’s queue.
Plan Review With Inspected
Inspected offers private provider plan review for Florida contractors, so projects move from submission to permit without waiting in the city’s review line.
Knowing both paths lets contractors pick the right review for each project.
Choose the Right Plan Review Path for Each Project
The best fit among Florida’s plan review services depends on the job. A residential plan review for a small project, with a responsive building department, may move fine through the city. A commercial build with a long city queue, or a schedule that cannot absorb a long wait, is where a private provider’s building code review services and the statute’s response deadlines pay off.
Florida contractors ready to move plans through review faster can contact the Inspected Team. The Inspected blog tracks permit and plan review updates across the state.
Florida Plan Review Questions
How Long Does Private Provider Plan Review Take in Florida?
The private provider’s own review time depends on the project and how many corrections the design needs. After the plans and affidavit reach the building department, the department has 10 business days to flag incomplete documents, or 5 business days for single-trade work on a one- or two-family home. If it misses that window, the permit is approved by law.
Does Using a Private Provider Lower Permit Fees?
Yes. Florida law requires local governments to cut permit fees for the review work a private provider performs. On commercial projects, the plan review share of the fee drops by at least 25%, and the cut reaches at least 50% once one provider covers every required plan review and inspection.
Is Third Party Plan Review and Approval Accepted Everywhere in Florida?
Yes. Third-party plan review and approval is a right under state law, so a city or county cannot refuse it or adopt stricter rules than the statute allows. Each local government must also keep a registration system for private providers, and registering costs the provider nothing.
What Did HB 803 Change About Permits in Florida?
HB 803, in effect since July 1, 2026, set a 5-day response window on permit applications for jobs under $15,000 and called for statewide uniform permit applications. It also locked in commercial fee cuts for private provider work and required every local government to run a private provider registration system.