Recognized by the SFBJ as the fastest growing business in South Florida! Contact us today and find out why so many are switching to virtual inspections.
The Future of Inspections is Virtual — Safer, Faster, Smarter. See how contractors are building without delays. Read more
Broward County Approves Virtual Inspections — Cut wait times by over 90%, from months to days. Read more
Broward County Greenlights Virtual Inspections — Same-day approvals, fewer delays, faster completions for contractors. Read more
We did it! 🏆 Inspected is a 2026 Best of Florida Award Winner for Home Inspection Services. Read the announcement

Plan Review Services in Florida: City Review vs. Private Provider

Plan review services in Florida come in two forms: the city or county building department, or a licensed private provider the property owner hires. Both check the same plans against the same Florida Building Code. What changes is who does the review, what lands on the building official’s desk, and how long the department gets to respond.

Many contractors default to the city queue because it is the path they know. The private provider route has been in Florida law for years, and the 2026 changes tightened the rules on how fast a building department must respond. For a crew waiting on a permit, the choice between the two paths often decides when work can start.

What Is Plan Review?

Plan review sits at the front of the permit process:

Florida contractors have two ways to get that review done.

Plan Review Services Florida Contractors Can Choose From

Florida contractors have two paths: the local building department or a private provider hired by the property owner, or by the contractor with the owner’s written permission. Both review against the Florida Building Code. The difference is who reviews, what the city receives, and what the city can charge.

City Review vs. Private Provider Review

The two paths line up side by side like this:

The private provider path comes from one Florida law.

What Florida Statute 553.791 Says About Private Plan Review

The law sets a few ground rules on who can review and what they hand over:

Response Deadlines on Private Provider Plans

Florida Statute 553.791 also puts the building department on the clock once the plans and affidavit arrive:

The law covers homes and commercial buildings alike, but the review itself looks different for each.

Residential vs. Commercial Plan Review

Residential plan review covers homes, most often one- and two-family dwellings. Commercial plan review covers offices, retail, restaurants, and mixed-use buildings, and it usually involves more reviewers and a larger document set. Two Florida jurisdictions show the gap clearly.

Residential vs. Commercial Plan Review at a Glance

The two review types differ in scope, paperwork, and how the private provider rules apply:

Florida’s 2026 permitting law changed parts of this process for both.

What Florida’s 2026 Permitting Law Changed for Plan Review

With those rules in place, the private provider process follows a set order.

How Third-Party Plan Review and Approval Works, Step by Step

Third-party plan review and approval follows the same order on every job, from hiring the provider to picking up the permit:

On this path, most of the review time sits with the private provider in step 3 instead of in the city’s queue.

Plan Review With Inspected

Knowing both paths lets contractors pick the right review for each project.

Choose the Right Plan Review Path for Each Project

The best fit among Florida’s plan review services depends on the job. A residential plan review for a small project, with a responsive building department, may move fine through the city. A commercial build with a long city queue, or a schedule that cannot absorb a long wait, is where a private provider’s building code review services and the statute’s response deadlines pay off.

Florida Plan Review Questions

How Long Does Private Provider Plan Review Take in Florida?

The private provider’s own review time depends on the project and how many corrections the design needs. After the plans and affidavit reach the building department, the department has 10 business days to flag incomplete documents, or 5 business days for single-trade work on a one- or two-family home. If it misses that window, the permit is approved by law.

Does Using a Private Provider Lower Permit Fees?

Yes. Florida law requires local governments to cut permit fees for the review work a private provider performs. On commercial projects, the plan review share of the fee drops by at least 25%, and the cut reaches at least 50% once one provider covers every required plan review and inspection.

Is Third Party Plan Review and Approval Accepted Everywhere in Florida?

Yes. Third-party plan review and approval is a right under state law, so a city or county cannot refuse it or adopt stricter rules than the statute allows. Each local government must also keep a registration system for private providers, and registering costs the provider nothing.

What Did HB 803 Change About Permits in Florida?

HB 803, in effect since July 1, 2026, set a 5-day response window on permit applications for jobs under $15,000 and called for statewide uniform permit applications. It also locked in commercial fee cuts for private provider work and required every local government to run a private provider registration system.