
Third-Party Inspections: How They Work by State
Third-party inspections let a qualified professional outside the building department inspect permitted work. Florida, Georgia, and Texas each set their own rules on who qualifies and when the option applies.

Commercial Roof Inspection Guide for Contractors
A commercial roof inspection on a permitted job checks the work against the Florida Building Code. Stages, product approvals, the 25% rule, and flat roof timing all decide whether the permit closes on schedule.

Florida Building Code 9th Edition: What Changes on Dec. 31, 2026
The Florida Building Code 9th Edition takes effect Dec. 31, 2026. This guide covers which permits it applies to, what changes, and how contractors can prepare.

City of Tampa Permits: A Contractor’s Guide to Faster Approvals and Inspections
City of Tampa permits run through Accela, but plan reviews and inspection waits can slow a job. This guide covers how the city process works, how it differs from Hillsborough County’s, and when a private provider can help.

Plan Review Services in Florida: City Review vs. Private Provider
Plan review services Florida contractors use come from the city or a private provider. Florida Statute 553.791 sets the deadlines on the private path.

Common Solar Panel Problems: Why Solar Systems Fail and How Contractors Prevent Them
Solar panel problems that take a system offline usually start at the inverter, wiring, or roof mounts, not panel degradation. Here is how crews prevent them.

Florida Roofing Permit Inspections: From Dry-In to Final Without the Wait
A roofing permit Florida contractors pull can require a roof dry-in inspection, a final, and sometimes a roof deck inspection. Here is what each checks.

What Florida Contractors Get Wrong About Private Provider Inspections
HB 803 changed the rules for private provider inspections in Florida. The statute sets plan review deadlines, protects virtual inspections, and limits audits.

What Happens When a Building Permit Expires in Nashville
Nashville does not send a warning before a building permit lapses. The first sign that a permit has expired is usually an inspector at the job site, a lender flagging the property during closing, or a subcontractor who can no